Batching plant Process
Sales Representative at haomei machinery equipment co., ltd
Here haomei will share some information of concrete batching plant working procedures with you as followings:
1.Raw materials are transported into the car plant, fly ash (or sand, stone powder) in the raw materials field, when used with the shipment into the hopper.
2.Bagged cement or cement in bulk cement stored in the library. When used with the shipment into the hopper. Chemicals, aluminum and other chemicals were placed in the library, the library aluminum shipment to the use of each workshop.
3.Process: aerated concrete block material handling fly ash (or sand, stone powder) by electromagnetic vibrating feeder, belt conveyor into the ball, fly ash (or sand, stone powder) ground after fly ash slurry concrete pump were sent to the storage tank. 4.Lime by the electromagnetic vibrating feeder, belt conveyor into the jaw crusher for crushing, crushed lime by bucket elevator into the lime silo, and then by a screw conveyor into the mill, grinding after materials are screw conveyor, bucket.